TM 10-8415-210-13&P4-2. SERVICE UPON RECEIPT OF MATERIEL. (CONT)(1)Damage. Check the equipment for damage incurred during shipment. Report any damage on DD Form 6,Packaging Improvement Report. Also note damage on DA Form 2404, Equipment Inspection and MaintenanceWorksheet, and initiate corrective maintenance procedures in accordance with Section III of this chapter.(2)Completeness. Inspect the contents of the shipment against the packing slip to see if any items aremissing (See Appendix C, Components of End Item). Report any discrepancies noted in accordance with instructions inDA Pam 738-750. The equipment can be placed in service even if accessory or other parts/assemblies that are notaffecting proper functioning, are missing.(3)Modifications. Check DA Pam 25-30 to see if there is any MWO applicable to the TAP Ensemblecomponents you are unpacking. If an MWO is listed, check DA Form 2408-5 Equipment Modification Record, to see if ithas been applied to the equipment. The MWO number will be shown on the case/bag near the equipment nomenclature.If a current MWO is listed in DA Pam 25-30 but there is no evidence that it has been applied to the equipment you areunpacking, note discrepancy on DA Form 2404, Equipment Inspection and Maintenance Worksheet.Section III. PREPARATION FOR STORAGE OR SHIPMENT4-3. PREPARATION FOR STORAGE. To prepare the TAP Ensemble equipment for storage, clean and dry thecomponents as described in paragraph 3-3. Perform operator PMCS as specified in Table 2-1. Store all items ofprotective clothing in a clean dry place. Hang coveralls and hood by suspension loops attached to each item. Storegloves, flat without crushing or folding. Store boots on dunnage at least six inches from floor. Place unopened bags ontoa wooden pallet and store.a.SpecialInstructionsforAdministrativeStorage. Placement of equipment in administrative storage should be forshort periods of time when a shortage of maintenance resources exist. Items should be in mission readiness within 24hours or within the time factors as determined by the directing authority. Appropriate maintenance records will be keptduring storage. Before placing equipment in administrative storage, current maintenance services and EquipmentServiceability Criteria (ESC) evaluations should be completed, shortcomings and deficiencies should be corrected, andall Modification Work Orders (MWOs) should be applied.b.Storagesiteselection. Inside storage is preferred for items selected for administrative storage. If inside storageis not available trucks, vans, conex or other containers may be used.4-4. PRESERVATION. If the TAP Ensemble components are to be stored without regular PMCS being performed,consult TM 38-230-2 for preservation requirements.4-5. PREPARATION FOR SHIPMENT. Prepare the TAP Ensemble for shipment by packing components into original orsimilar containers, in which they were received. Strap containers onto wooden pallet.4-2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business