TM 10-5410-228-24
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools/Test Equipment:
Equipment Conditions:
Shop Equipment, Automotive Maintenance and
Power shut off, power panel and rear control panel
tagged.
Alternator and Power Steering Belts removed (see
Materials/Parts:
References:
TM 9-2320-387-24-1
Personnel Required: (2)
(1)
Disconnect wiring and remove voltage regulator per TM 9-2320-387-24-1.
Alternator must be supported during removal and installation. Failure to support alternator
may cause injury to personnel or damage to equipment.
(2)
(3)
Remove screw (5), lockwasher (6), washer (7), and alternator (4) from bracket (8). Discard
lockwasher (6).
NOTE
Perform steps 4 and 5 for alternate configuration.
(4)
Remove nut (9), lockwasher (10), two washers (11), screw (12) and alternator (4) from bracket
(8). Discard lockwasher (10).
(5)
Remove screw (5), lockwasher (6), washer (7), and alternator (4) from bracket (8). Discard
lockwasher (6).
(6)
(1)
(2)
Secure alternator (4) to bracket (8) with screw (5), new lockwasher (6) (Item 9, Appendix E) and
washer (7). Torque screws to 48 ft-lb.
(3)
Install two screws (1), two new lockwashers (2) (Item 10, Appendix E) and two washers (3).
Torque screws to 48 ft-lb.
NOTE
Perform steps 4 and 5 for alternate configuration.
(4)
Secure alternator (4) to bracket (8) with screw (5), new lockwasher (6) (Item 9, Appendix E) and
washer (7). Torque screw to 48 ft-lb.
(5)
Install screw (12), two washers (11), new lockwasher (10) (Item 29 Appendix E) and nut (9).
Torque to 48 ft-lb.