TM 10-5410-228-10
APPENDIX G
CBPS PERFORMANCE MEASURES
CBPS Performance Measures (Cab Crew)
REFERENCES:
TM 10-5410-228-10....... Chemical Biological Protective Shelter
TM 9-6115-642-10......... Generator Set, Skid Mounted, Tactical Quiet
FM 5-424 ....................... Theater of Operations Electrical Systems
NO GO
GO
1. Perform CBPS PMCS in accordance with TM 10-5410-228-10.
____
____
2. Perform 10K PMCS in accordance with TM 10-5410-228-10.
____
____
3. Hook up Trailer to ECV.
____
____
4. Select appropriate site to establish system with minimum area of
____
____
50 X 100 ft. with 15 ft overhead clearance.
5. Position trailer with TQG ensuring front driver side ECV tire
____
____
aligned with trailer axle allowing for 4 6 ft. space.
6. Unload HMT and stage equipment.
____
____
7. Ground system IAW FM 5-424 and local policies.
____
____
8. Prepare TQG for Operation.
____
____
9. Position and prepare ABS for establishment.
____
____
10. Engage EPG as directed by LMS crew.
____
____
11. Establish Talp Door.
____
____
12. Establish AMB Door.
____
____
13. Send in equipment sets to ABS.
____
____
14. Establish any additional equipment to receive patients.
____
____
15. Switch from Internal to External.
____
____
16. Complex systems.
____
____
17. Strike systems.
____
____
Change 1
G-1/(G-2 blank)