TM 10-5410-228-10
(1)
Help deploy systems per para 2.24.2.2 through 2.24.2.4.
(2)
To prevent tripping hazards, determine routing and placement of power cables inside ABS.
2.24.2.8 MTF Setup.
a. Cab Crew Tasks
(1)
Select sight on level, dry ground in clear area approximately 88 feet by 52 feet with a minimum
of 15 feet of overhead clearance (figure 2-24).
NOTE
Before connecting shelters, all oversize equipment must be placed inside shelter. Visually
check DCS openings to verify that openings form a straight line. Make adjustments before all
systems are connected and equipment installed.
(2) Deploy Dental Lab and X--ray per para 2.24.2.
(3) Deploy EMT, ATM, and Patient Hold per para 2.24.2.5.
b. LMS Crew Tasks
To prevent injury to personnel, use caution when walking through entrance to ABS, hose
assemblies and cables are on the floor of ABS.
To prevent damage to hose assemblies and cables on floor of ABS at the entrances, place
hoses and cables up against the inside exterior wall of ABS.
(1) Help deploy systems per para 2.24.2.2 through 2.24.2.4.
(2) To prevent tripping hazards, determine routing and placement of power cables inside ABS.
2.24.2.9 FST and MTF Combined Setup.
a. Cab Crew Tasks
(1) Select sight on level, dry ground in clear area approximately 154 feet by 52 feet with a minimum
of 15 feet of overhead clearance (figure 2-24).
NOTE
Before connecting shelters, all oversize equipment must be placed inside shelter. Visually
check DCS openings to verify that openings form a straight line. Make adjustments before all
systems are connected and equipment installed.
(2)
Deploy EMT in center of cleared area per para 2.24.2.
(3)
Deploy the rest of systems out from EMT per para 2.24.2.2 through 2.24.2.4.
b. LMS Crew Tasks
To prevent injury to personnel, use caution when walking through entrance to ABS, hose
assemblies and cables are on the floor of ABS.
Change 1
2-95