TM 5-3740-218-13&P
4-14. DOOR LID ASSEMBLY REPLACEMENT
This task covers:
Removal
Installation
A.
INITIAL SETUP
Tools and Special Equipment:
Tool Kit, 5180-00-177-7033
Drill with 3/16-in. Drill Bit
Pop Riveter, PRG 430
Materials/Parts:
Rivet, Pop (4)
Appendix E, Item 49
B.
REMOVAL
Drill out four pop rivets (1) and remove door assembly (2).
C.
INSTALLATION
Align door assembly (2) on bucket opening and install four pop rivets (1).
4-22