ARMY TM 3-6665-329-13&P
AIR FORCE TO 11H2-18-1
Table 3-1. Inspection Procedures
Location
Item
Action
Remarks
2.
Panel
a. PRESSURE VACUUM
Check for cracks.
assembly (cont)
and flowmeter (5).
b. Flow adjust valve
Check for cracks or
(6), ALARM TEST
missing knobs.
switch (7) and METER
c. PNEUMATIC LINE
(1) Open cover.
STORAGE compartment
(9).
(2) Check to see that
VACUUM TEST hose and
PRESSURE TEST hose are
not split or cracked.
(3) Close cover.
3-6
Change 2