TM 10-5410-228-24
Hand tighten to avoid damage to plastic fittings during disassembly or assembly. Do not over
tighten the fittings during assembly.
NOTE
Dump bulkhead fitting has left-hand threads.
(4)
Insert threaded end of dump bulkhead fitting (12) through dump port opening in ABS wall, and
secure in place with gasket (11) and nut (10).
(5)
Ensure threads of camlock fitting (9) are clean.
(6)
Apply sealant to threads of camlock fitting (9).
(7)
Install camlock fitting (12) on air beam (2).
(8)
Attach lanyard (8) to camlock cap (4).
(9)
Attach two rings (15) to two latches (3) on camlock cap (4).
(10) Attach lanyard (8) to camlock fitting (9).
(11) Install camlock cap (4) onto camlock fitting (9).
(12) Install cam lock cap (4) then, open shut-off valve (1) and inflate air beam (2). Observe the entire
air beam for leaks and proper orientation.
NOTE
Partially deflate air beam to lower ABS for ease of air beam installation.
(13) Ensure that center line mark on air beam is centered within the ABS. Secure air beam to ABS
with lacing rope (13).
2-319