TM 10-5410-228-24
This task covers:
c. Assembly
a. Removal
d. Installation
b. Disassembly
INITIAL SETUP
Tools/Test Equipment:
Equipment Conditions:
Shop Equipment, Automotive Maintenance and
ECV off, system power off.
Power panel and rear control panel tagged.
ECV hood raised.
Materials/Parts:
ECV battery ground cable disconnected
(see TM 9-2320-387-24-1).
References:
TM 9-2320-387-24-1
NOTE
The Electronically Programmed Governor (EPG) system consists of three major components:
EPG control unit, magnetic pickup, and EPG actuator.
Remove/disassemble only to the extent necessary to remove or replace defective
assemblies/components. Use standard maintenance shop practices/procedures.
(1)
Loosen four captive screws (1) and remove EPG control unit cover (2).
(2)
Tag and disconnect all wires from terminal block mounted on EPG control unit (3) by loosening
screws (4).
NOTE
Washers, lockwashers, and nuts are located in engine compartment.
(3)
Remove four screws (5), four washers (6), four lockwashers (7) and four nuts (8) securing EPG
control unit (3) to ECV fire wall. Discard four lockwashers (7).
(1)
Locate EPG control unit (3) and secure to ECV fire wall with four screws (5), four washers (6),
four new lockwashers (7) (Item 17, Appx E) and four nuts (8).
NOTE
Washers, lockwashers, and nuts are located in engine compartment.
(2)
Connect all wires to EPG control unit (3) terminal block with screws (4). Remove tags.
(3)
(4)
Install EPG control unit cover (2) over EPG control unit by inserting and tightening four captive
screws (1) into ECV fire wall threaded mount holes.
(1)
Remove bolt (9) and clamp (10) securing magnetic pickup cable assembly (11) to engine bell
housing (12).
(2)
Tag and disconnect two wires (terminal 10) and shielded wire (terminal 11) connecting cable
assembly (11) to EPG control (3) by loosening two screws (4).