T.O. 33B-1-1
6-81
Figure 6-39. Manual Film Processing.
a. Immerse the films (and hanger) in the developing solution. Agitate the hangers by hand at 30-second
intervals. This must be done during the entire developing time.
b. Remove the films from the developer and immerse in stop bath for approximately 1 minute.
c. Remove the films from the stop bath solution and immerse in the fixing solution. The total "clearing
time" SHALL be determined according to Paragraph 6.7.9.
d. Remove the films from the fixing bath and immerse in the wash water for the recommended period.
e. Dry the films.
f. Remove the films from the film hangers.