T.O. 33B-1-1
Table 1-3.
Frequency for Process Control
LIQUID PENETRANT
INTERVAL
PG
PARA
Crack Chrome Panels/Material
Determined By Workload
1-32
1.5.4.2
Performance
Developer Specific Gravity/Water
7 Days
1-41
1.5.5.6.1
Soluble
Remover Contamination Check
30 Days
1-37
1.5.5.4.1.1
Remover Performance Check
30 Days
1-37
1.5.5.4.1.2
Spray Remover Concentration Check
30 Days
1-38
1.5.5.4.2.1
Wash Nozzle Check/Spray Angle
30 Days
2-51
2.5.4.5.2.4
Penetrant Brightness/Depot; Optional
30 Days
1-34
1.5.5.2.2b
Field
Penetrant Wetability/Surface Wetting
90 Days
1-34
1.5.5.2.2a
Water Content Test/Hydrophilic
90 Days
1-36
1.5.5.4
Remover
Dryer Temperature
180 Days
1-25
1.5.2.10
Quality Conformance Test
(New Solution)
1-30
1.5.3.4
MAGNETIC PARTICLE TESTING
INTERVAL
PG
PARA
Concentration/Suspension Settling Test
Determined by Workload
1-44,
1.6.4,
3-69
3.5.6.8
Determination of Vehicle Fluorescence
In Conjunction with Suspension
3-74
3.5.7.5.2
Settling Test
System Effectiveness Test
Minimum of Once Every 7 Days
1-48
1.6.10
Ambient Light Check PT & MT
60 Days
1-27
1.5.2.12c
Black Light Intensity PT & MT
Daily or Prior to Use
2-79
2.7.4.1.5
Amperage Indicator Check
6 Months
1-49
1.6.11
Quick Break
60 Days
1-50
1.6.12
WATER MPI BATH ONLY
INTERVAL
PG
PARA
Water Break Test
Daily
3-26
3.3.6.1
MAGNETIC PARTICLE PORTABLE
INTERVAL
PG
PARA
Dead Weight
30 Days
1-46
1.6.7.2c
EDDY CURRENT
INTERVAL
PG
PARA
Probe Sensitivity/Signal To Noise Ratio
Per Inspection Check
4-51
4.5.2.8
ULTRASONIC INSPECTION
INTERVAL
PG
PARA
Vertical Linearity
Determined By Lab Supervisor
1-57
1.8.2.1
Horizontal Linearity
Determined By Lab Supervisor
1-58
1.8.2.2
Sensitivity Check
Determined By Lab Supervisor
1-59
1.8.2.3
1-16
Change 3