TM 5-6635-386-12&PAPPENDIX B - CONTINUEDMAINTENANCE ALLOCATION CHART FOR TESTER,DENSITY AND MOISTURE (SOIL AND ASPHALT) NUCLEAR METHOD (CCE)SECTION II. - ASSIGNMENT OF MAINTENANCE FUNCTIONS(1) (2) (3) (4) (5)Group Maintenance Maintenance Level* Tools andNumber Component/Assembly Function C O F H D EquipmentBattery Inspect 0.1Test 0.1Service 0.1Replace 0.1Shutter/Cleanout Service 0.1Plate Replace *Fuses Test 0.1Replace 0.1End Item Inspect 0.1Test 0.2**Service 0.1Adjust 0.1Calibrate *Replace *Repair *Overhaul ** By manufacturer** This operation performed by the LRPO for the leak testSECTION III. - TOOL AND TEST EQUIPMENT REQUIREMENTSTool or TestEquipmentReference Maintenance National/NATO ToolCode Category Nomenclature Stock Number NumberNOTEWipe test kits will be supplied by the US Army Ionizing Radiation Dosimetry Center.B-3/(B-4 blank)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business