TM 5-6635-386-12&P
APPENDIX B - CONTINUED
MAINTENANCE ALLOCATION CHART FOR TESTER,
DENSITY AND MOISTURE (SOIL AND ASPHALT) NUCLEAR METHOD (CCE)
SECTION II. - ASSIGNMENT OF MAINTENANCE FUNCTIONS
(1)
(2)
(3)
(4)
(5)
Group
Maintenance
Maintenance Level*
Tools and
Number
Component/Assembly
Function
C
O
F
H
D
Equipment
Battery
Inspect
0.1
Test
0.1
Service
0.1
Replace
0.1
Shutter/Cleanout
Service
0.1
Plate
Replace
*
Fuses
Test
0.1
Replace
0.1
End Item
Inspect
0.1
Test
0.2**
Service
0.1
Adjust
0.1
Calibrate
*
Replace
*
Repair
*
Overhaul
*
* By manufacturer
** This operation performed by the LRPO for the leak test
SECTION III. - TOOL AND TEST EQUIPMENT REQUIREMENTS
Tool or Test
Equipment
Reference
Maintenance
National/NATO
Tool
Code
Category
Nomenclature
Stock Number
Number
NOTE
Wipe test kits will be supplied by the US Army Ionizing Radiation Dosimetry Center.
B-3/(B-4 blank)