TM 5-3740-214-14
CONTROL PANEL MAINTENANCE (Continued)
Figure 5-274. Flowmeter Assembly
NOTE
Lubricate the O-rings with silicone grease before inserting them.
(8) Attach flowmeter to control panel with fittings, new O-rings, tube retainer, and control valve.
f. Assemble and install control panel.
(1) Attach thermometer and temperature well to control panel.
(2) Attach pressure gage to control panel.
(3) Attach light assembly to control panel.
(4) Attach solenoid valve switch to control panel.
g. Assemble masts.
(1) Attach conduit nut, universal joint and close nipple to inner mast.
(2) Attach floor flange to outer mast.
(3) Slide inner mast into outer mast.
5-246