TM 5-3740-214-14
SHUTDOWN PROCEDURES (Continued)
(1) Turn the nozzle down and aim it into a bucket.
(a) Loosen the elbow adjusting nut and turn the elbow to the desired position.
(b) Tighten the elbow adjusting nut.
(c) Loosen the nozzle adjusting nut and turn the nozzle down to aim it into the bucket.
(d) Tighten the nozzle adjusting nut.
(2) Make sure the three-way valve is still in the ULV position.
(3) Add flushing solvent to the flush tank. Do not fill the tank more than 3/4 full.
Figure 2-33. Flush Tank Disassembly
2-29