TM 5-3655-214-13&P
SECTION II. MAINTENANCE ALLOCATION CHART
FOR
CARBON DIOXIDE RECHARGING UNIT
(1)
(5)
(2)
(3)
(6)
(4)
GROUP
TOOLS AND
COMPONENT/
MAINTENANCE
REMARKS
MAINTENANCE LEVEL
NUMBER
EQUIPMENT
ASSEMBLY
FUNCTION
CODE
REFERENCE
CODE
FIELD
SUSTAINMENT
DIRECT GENERAL
UNIT
DEPOT
SUPPORT SUPPORT
C
O
F
H
D
01
SUPPORTS
Replace
0.5
1
02
GUARDS
Replace
0.3
1
03
BELT AND
Inspect
0.1
PULLEY
Adjust
0.3
1
BELT
Replace
0.5
1
PULLEY
Replace
0.4
1
04
ELECTRIC
Inspect
0.1
MOTOR
Test
0.1
3
MOTOR
Service
0.1
ASSEMBLY
Replace
0.6
1
Repair
3.0
1
CAPACITOR
Test
0.1
Replace
0.3
2
05
LINES AND
Inspect
0.1
FITTINGS
Replace
0.2
1
HOSE
ASSEMBLIES
VALVES,LINES
Inspect
0.2
AND FITTINGS
Replace
0.5
1
06
PUMP
Service
0.1
PUMP ASSEMBLY
Repair
1.0
1
07
STARTER AND
Test
0.1
3
CABLES
Replace
0.5
1
STARTER
Power Cable
0.5
1
Repair
1.0
1
1
WIRING
Replace
0.5
1
HARNESS
Repair
1.0
5.0
1
08
SKID
Replace
B-5
Change 1