• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Cleaning and Inspection.
Chassis Assembly

Indicator, Outlet Valve Leakage, M4A1
Page Navigation
  15    16    17    18    19  20  21    22    23    24    25  
img
. . . . . . . . . . . .
TM 3-6665-209-35
CHAPTER 3
FIELD MAINTENANCE INSTRUCTIONS-FOURTH ECHELON
Section I. GENERAL
20. Special Tools
authorized to repaint the indicator as necessary. Refer
to TM 9-213 for painting instructions for field use.
No special tools are required for fourth echelon
b. Paints to be Used.
maintenance of the indicator.
(1) Primer. Use synthetic paint primer before
painting any surface requiring a painted
21. Equipment
finish.
(2) Exterior paint.  Repaint exterior surfaces
No special equipment is required for fourth echelon
of components which require paint with
maintenance of the indicator.
black wrinkle paint.
22. Painting
a. General. Fourth echelon personnel are
Section II. CHASSIS GROUP
23. Chassis Assembly
(e) Balance orifice holder. Remove the
balance orifice holder (par. 11).
a. Description. The chassis assembly is the major
(f) Motor
and
pump
assembly.
unit of the indicator. It is described in paragraph 7 while
Remove  the  motor  and  pump
its subassemblies are described in the succeeding
assembly (par. 12).
paragraphs.
(g) Air shutoff valve assembly. Remove
b. Maintenance.
Fourth echelon maintenance
the air shutoff valve assembly (par.
personnel are authorized to replace all components of
13).
the  chassis  assembly.
Maintenance  of  those
(h) Electric chassis assembly. Remove
components  not  authorized  to  lower  echelons  of
the  electric  chassis  assembly
maintenance personnel will be covered in the following
(TM 3-6665-209-12).
paragraphs.
The procedures below describe the
(i) Calibrator assembly.  Remove the
complete  dismantling  of  the  chassis  assembly.
calibrator assembly (par. 25).
However,  disassembly  procedures  for  the  electric
(j) Pressure gage.
chassis assembly, the calibrator assembly, and the
1. Disconnect the tube coupling
motor and pump assembly are covered in separate
nut that connects the copper
paragraphs.
tubing (57, fig. 4) to the center
(1) Removal and disassembly.
connection of the pressure gage
(a) Chassis assembly.
Remove the
(9).
chassis
assembly
2. Remove
three
nuts
(29),
(TM 3-6665-209-12).
lockwashers (28), and screws
(b) Electric bell DS5.
Remove the
(10) which secure the pressure
electric bell DS5 (par. 8).
gage to the front panel (42, fig.
(c) Fuse holder XF1. Remove the fuse
3). Work the pressure gage out
holder XF1 (par. 9).
through the rear of the front
(d) Indicator  lights.
Remove  the
panel.
indicator lights (par. 10).
( k ) VALVE fixture.
1. Pull the rubber tubing (16, fig. 4)
AGO 8069A
22


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.