• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Installation cont'd -812530546
Figure 3-23. Hydraulic Manifold Replacement (Sheet 1 of 2)

TM-10-5410-228-24 Chemical Biologiocal Protective Shelter (CBPS) System NSN 5410-01-441-8054 (Green) (EIC:5ZT) NSN 5410-01-482-4633 (Tan) Manual
Page Navigation
  517    518    519    520    521  522  523    524    525    526    527  
TM 10-5410-228-24
(55) Lubricate O-ring (25) with a light coating of hydraulic fluid.
(56) Install connector (23) on hydraulic manifold (3), finger tight.
(57) Torque connector (23) to 190 10 in.-lb (16 1 ft-lb).
(58) Install new O-ring (24) (Item 61, Appx E) on connector (23). Ensure O-ring (24) is seated and
retained properly.
(59) Lubricate O-ring (24) with a light coating of hydraulic fluid.
(60) Install tube assembly (22) on connector (23), finger tight.
(61) Torque tube assembly (22) to 220 10 in.-lb (18 1 ft-lb).
(62) Unplug port on hydraulic manifold (3) and end of tube assembly (26).
(63) Check sealing surfaces on elbow (27) for damage or material build up. If required, replace elbow
(27) or clean any material build up with clean, lint-free cloth.
(64) Install new O-ring (29) (Item 50, Appx E) on elbow (27). Ensure O-ring (29) is seated and
retained properly.
(65) Lubricate O-ring (29) with a light coating of hydraulic fluid.
(66) Install elbow (27) on hydraulic manifold (3), finger tight.
(67) Torque elbow (27) to 190 10 in.-lb (16 1 ft-lb).
(68) Install new O-ring (28) (Item 61, Appx E) on elbow (27). Ensure O-ring (28) is seated and
retained properly.
(69) Lubricate O-ring (28) with a light coating of hydraulic fluid.
(70) Install tube assembly (26) on elbow (27), finger tight.
(71) Torque tube assembly (26) to 220 10 in.-lb (18 1 ft-lb).
(72) Unplug port on hydraulic manifold (3) and end of tube assembly (30).
(73) Check sealing surfaces on connector (31) for damage or material build up. If required, replace
connector (31) or clean any material build up with clean, lint-free cloth.
(74) Install new O-ring (33) (Item 57, Appx E) on connector (31). Ensure O-ring (33) is seated and
retained properly.
(75) Lubricate O-ring (33) with a light coating of hydraulic fluid.
(76) Install connector (31) on hydraulic manifold (3), finger tight.
(77) Torque connector (31) to 780 25 in.-lb (60 2 ft-lb).
(78) Install new O-ring (32) (Item 63, Appx E) on connector (31). Ensure O-ring (32) is seated and
retained properly.
(79) Lubricate O-ring (32) with a light coating of hydraulic fluid.
(80) Install tube assembly (30) on connector (31), finger tight.
(81) Torque tube assembly (30) to 480 25 in.-lb (40 2 ft-lb).
3-123






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.