• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Repair
Pressure Gage Assembly Repair.

TM-10-5410-228-24 Chemical Biologiocal Protective Shelter (CBPS) System NSN 5410-01-441-8054 (Green) (EIC:5ZT) NSN 5410-01-482-4633 (Tan) Manual
Page Navigation
  382    383    384    385    386  387  388    389    390    391    392  
TM 10-5410-228-24
2.16.4 Inflation Manifold Replacement Continued.
6
1
4
6
4
1
LMS
1
3
4
6
2
6
4
1
1
4
6
4
1
8
8
8
8
8
8
6
1
5
7
AMBULATORY
DOOR AIR BEAM
8
ABS
169-1-M-A
Figure 2-66. Inflation Manifold Replacement
Follow-on maintenance: Install insulation (reference TM 10-5410-228-10), apply power and perform
operational test.
2-324






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.