• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2-46. Pan Assembly Replacement (Sheet 5 of 6)
Temperature Control Unit and Support Enclosure Replacement.

TM-10-5410-228-24 Chemical Biologiocal Protective Shelter (CBPS) System NSN 5410-01-441-8054 (Green) (EIC:5ZT) NSN 5410-01-482-4633 (Tan) Manual
Page Navigation
  296    297    298    299    300  301  302    303    304    305    306  
TM 10-5410-228-24
2.13.25 Pan Assembly Replacement Continued.
111-6-M-A
D-D
VIEW
Delay time and pin settings:
Item 53 TD1 (30 seconds):
Pins 2, 3, 4, and 5 to ON.
Pins 1, 6, 7, 8, 9, and 10 to OPEN.
Item 48 TD2 (600 seconds):
Pins 4, 5, 7 and 10 to ON.
Pins 1, 2, 3, 6, 8 and 9 to OPEN.
Item 43 TD3 (60 seconds):
Pins 3, 4, 5 and 6 to ON.
Pins 1, 2, 7, 8, 9 and 10 to OPEN.
Item 38 TD4 (3 seconds):
Pins 1 and 2 to ON.
Pins 3, 4, 5, 6, 7, 8, 9 and 10 to OPEN.
Figure 2-46. Pan Assembly Replacement (Sheet 6 of 6)
Follow-on maintenance: Connect ECV battery ground cable per TM 9-2320-387-24-1 or connect external
power cable, install guard per para 2.13.20 or 2.13.21, install temperature control unit per 2.13.26, install
cover assembly per para 2.13.23, install power mode switch per para 2.13.24, remove tags, apply power and
perform operational test.
2-238






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.